Date:
Saturday, 16 May, 2015
Brett (6 hours) and Tom helping for an hour or two. Very helpful to unload sheets!
- Prep site, remove junk
- Buy materials ready for foundations.
Also checked levels. From the top (AHD 7760) to the lowest point in SW corner it's 700 (RL -700). Then a 360 fall (1:50 over 18m) to the bottom retaining wall which is 700 high.
Did first setout at night so I could see the laser. Use beeping detector in the distance to square the lines. Need to use quality pegs.