Date:
Thursday, 4 June, 2015
Brett, Justine, Mika. Alan as goofer.
- Finished bathroom setdown and built dwarf wall (annoying to make small stud walls from decking steel)
- Used 3mm HDPE packers - cut into 40mm strips on the tablesaw. This was okay.
- Polyurethane and liquid nails kindof sticks it.We used masking tape to attach to top of bearers.
- Adding foam insulation is tricky. Liquid nails sticks. Polyurethane foams and is very strong. Low-fill foam would be better, but yet to find a re-usbale gun.
- Bought plasterer's angle to mount foam under joists - to see.
- Bought FC sheet blade to cut 22mm Scyon flooring.